B2Gold Reports Strong Q4 and Full Year 2023 Results; Achieved 2023 Total Gold Production and Consolidated Cost Guidance; Q1 2024 Dividend of US$0.04 per Share Declared

by

in

VANCOUVER, British Columbia, Feb. 21, 2024 (GLOBE NEWSWIRE) — B2Gold Corp. (TSX:BTO, NYSE:BTG, NSX: B2G)) (“B2Gold” or the “Company”) announces its operational and financial results for the fourth quarter and full year 2023. The Company previously released its gold production and gold revenue results for the fourth quarter and full year 2023. All dollar figures are in United States dollars unless otherwise indicated.

2023 Fourth Quarter and Full Year Highlights

Total gold production of 288,665 ounces in Q4 2023: Total gold production in the fourth quarter of 2023 was 288,665 ounces, including 18,054 ounces of attributable production from Calibre Mining Corp. (“Calibre”). The Fekola, Masbate and Otjikoto mines all exceeded their expected production in the fourth quarter, with Otjikoto achieving record quarterly production of 81,111 ounces.

Total consolidated cash operating costs of $633 per gold ounce produced in Q4 2023: Total consolidated cash operating costs (see “Non-IFRS Measures”) (including estimated attributable results for Calibre) of $633 per gold ounce produced and consolidated cash operating costs from the Company’s three operating mines of $611 per gold ounce produced.

Total consolidated all-in sustaining costs of $1,257 per gold ounce sold in Q4 2023: Total consolidated all-in sustaining costs (see “Non-IFRS Measures“) (including estimated attributable results for Calibre) of $1,257 per gold ounce sold and consolidated all-in sustaining costs from the Company’s three operating mines of $1,264 per gold ounce sold.

Achieved upper half of 2023 annual gold production guidance: Record annual total gold production of 1,061,060 ounces (including 68,717 attributable ounces from Calibre) for 2023, achieving the upper half of the annual guidance range of between 1,000,000 and 1,080,000 ounces, and marking the Company’s eighth consecutive year of meeting or exceeding annual production guidance.

Below 2023 total consolidated cash operating cost guidance and achieved low end of 2023 all-in sustaining cost guidance range: Total consolidated cash operating costs for 2023 of $654 per gold ounce produced, well below the annual guidance range of between $670 and $730 per gold ounce primarily as a result of lower than expected fuel costs and a weaker Namibian dollar. Total consolidated all-in sustaining costs for 2023 of $1,201 per gold ounce sold, near the low end of the annual guidance range of between $1,195 and $1,255 per gold ounce.

Attributable net loss of $0.09 per share in Q4 2023; Adjusted attributable net income of $0.07 per share in Q4 2023: Net loss attributable to the shareholders of the Company of $113 million ($0.09 per share); adjusted net income (see “Non-IFRS Measures“) attributable to the shareholders of the Company of $91 million ($0.07 per share). For 2023, net income attributable to the shareholders of the Company of $10 million ($0.01 per share) and adjusted net income (see “Non-IFRS Measures“) attributable to the shareholders of the Company of $347 million ($0.28 per share).

Operating cash flow before working capital adjustments of $221 million in Q4 2023: Cash flow provided by operating activities before working capital adjustments was $221 million in the fourth quarter of 2023. Cash flow provided by operating activities before working capital adjustments was $834 million for the year ended December 31, 2023.

Strong financial position and liquidity: At December 31, 2023, the Company had cash and cash equivalents of $307 million and working capital (defined as current assets less current liabilities) of $397 million.

Construction at the Goose Project continues to progress on track, with the project remaining on schedule for first gold pour in the first quarter of 2025: Concrete and steel works in the mill area to date continue to progress ahead of schedule. Exterior cladding of the mill building and truck shop is complete, and cladding of the power house will start in the first quarter of 2024. Additionally, the ball mill will be set in place in the first quarter of 2024, approximately four months ahead of schedule. Following the successful completion of the 2023 sealift, construction of the 2024 winter ice road (“WIR”) is being finalized and scheduled to be fully operational by February 23, 2024, transporting all required materials from the Marine Laydown Area (“MLA”) to the Goose Project site by the end of April 2024.

Preliminary Economic Assessment (“PEA”) underway on the Gramalote Project with completion expected by the end of the second quarter of 2024: In 2023, B2Gold entered into a purchase agreement with AngloGold Ashanti Limited (“AngloGold”) to acquire AngloGold’s 50% interest in the Gramalote Project located in the Department of Antioquia, Colombia. B2Gold now owns 100% of the Gramalote Project. In 2023, the Company completed a detailed review of the Gramalote Project, including the facility size and location, power supply, mining and processing options, tailings design, resettlement, potential construction sequencing, and camp design to identify potential cost savings to develop a smaller scale project. A formal study commenced in the fourth quarter of 2023, with the goal of completing a PEA by the end of the second quarter of 2024.

Subsequent to year-end 2023, announced positive exploration drilling results from the Antelope deposit at the Otjikoto Mine in Namibia: On January 31, 2024, the Company announced positive exploration drilling results from the Antelope deposit, located approximately 3 kilometers (“km”) south of the Otjikoto Phase 5 open pit. The Antelope deposit has the potential to be developed as an underground mining operation, which could complement the expected processing of low-grade stockpiles at the Otjikoto mill from 2026 through 2031.

Subsequent to year-end 2023, received an upfront payment of $500 million, to further enhance financial flexibility and provide additional cash liquidity: In January 2024, B2Gold entered into a series of prepaid gold sales (the “Gold Prepay”) with a number of existing lenders to further enhance financial flexibility and provide additional cash liquidity at attractive terms as the Company continues to fund sustaining, development, and growth projects across the operating portfolio, and increase financial capacity for potential growth projects in Namibia and Colombia. The Company received an upfront payment of $500 million, based on gold forward curve prices averaging approximately $2,191 per ounce, in exchange for equal monthly deliveries of gold from July 2025 to June 2026 totaling 264,775 ounces, representing approximately 10% of expected annual gold production in each of 2025 and 2026 (subject to finalization of production guidance for 2025 and 2026). Gold deliveries can be from production from any of the Company’s operating mines and the Gold Prepay can be settled prior to maturity through accelerated delivery of the remaining deliverable gold ounces.

Q1 2024 dividend of $0.04 per share declared: On February 21, 2024, B2Gold’s Board of Directors declared a cash dividend for the first quarter of 2024 of $0.04 per common share (or an expected $0.16 per share on an annualized basis), payable on March 20, 2024, to shareholders of record as of March 7, 2024.

B2Gold consolidated gold production expected to increase to record levels in 2025: Based on current estimates, consolidated gold production is expected to be between 1,130,000 and 1,260,000 ounces in 2025, driven by a significant increase in gold production from the Fekola Complex, relative to 2024, as a result of the scheduled mining and processing of higher-grade ore from the Fekola and Cardinal pits made accessible by the meaningful stripping campaign that will be undertake throughout 2024, a full year contribution of higher-grade ore from Fekola Regional, and commencement of mining the higher-grade Fekola underground (subject to receipt of necessary permits for Fekola Regional and Fekola underground). In addition, the Goose Project is expected to commence gold production in the first quarter of 2025 and contribute between 220,000 and 260,000 ounces of gold production in calendar year 2025.

Update on Off-Site Attack in Mali

On February 15, 2024, the Company reported three fatalities from an off-site armed attack in Mali. Traveling on the national highway under Malian gendarme escort, a bus transporting B2Gold employees from the Fekola Mine to Bamako was involved in an incident when it was attacked approximately 75 km west of Bamako. This tragic event was the result of an armed attack on the employee transport convoy, which included Malian gendarmerie vehicles in front and in the rear of the transport convoy. Unfortunately, as of February 21, 2024, B2Gold deeply regrets to report that a fourth employee has passed away as a result of injuries sustained in the attack. Three employees remain in intensive care and are being treated for their injuries in Bamako. All B2Gold employees traveling on the bus have now been accounted for. B2Gold wishes to express its deepest condolences to the families of the deceased employees and extends its best wishes for a full recovery to all those employees who were injured in the attack.

The attack occurred over 300 km northeast of the Fekola Mine site, along a transport route that has been the focus of increased security presence by the Malian armed forces. Mining and processing activities at the Fekola Mine were not impacted by this incident. The Company is actively engaged with the Malian government on a full investigation into the cause of the attack, and on further improvements to security along the national highway.

Fourth Quarter and Full Year 2023 Results

 
Three months ended
Year ended

 
December 31
December 31

 
2023
2022
2023
2022
2021

 
 
 
 
 
 

Gold revenue ($ in thousands)
511,974
592,468
1,934,272
1,732,590
1,762,264

Net (loss) income ($ in thousands)
(117,396)
176,468
41,588
286,723
460,825

(Loss) earnings per share – basic(1)($/share)
(0.09)
0.15
0.01
0.24
0.40

(Loss) earnings per share – diluted(1)($/share)
(0.09)
0.15
0.01
0.24
0.40

Cash provided by operating activities ($ in thousands)
205,443
270,491
714,453
595,798
724,113

Total assets ($ in thousands)
4,874,619
3,681,233
4,874,619
3,681,233
3,561,293

Non-current liabilities ($ in thousands)
651,173
335,828
651,173
335,828
369,097

Average realized gold price ($/ounce)
1,993
1,746
1,946
1,788
1,796

Adjusted net income(1)(2)($ in thousands)
90,697
121,442
347,203
263,782
385,370

Adjusted earnings per share(1)(2)– basic ($)
0.07
0.11
0.28
0.25
0.37

Consolidated operations results:
 
 
 
 
 

Gold sold (ounces)
256,921
339,355
994,060
969,155
981,401

Gold produced (ounces)
270,611
352,769
992,343
973,003
987,595

Production costs ($ in thousands)
164,406
159,559
616,197
626,526
493,389

Cash operating costs(2)($/gold ounce sold)
640
470
620
646
503

Cash operating costs(2)($/gold ounce produced)
611
440
631
637
511

Total cash costs(2)($/gold ounce sold)
769
593
756
768
626

All-in sustaining costs(2)($/gold ounce sold)
1,264
876
1,199
1,022
874

Operations results including equity investment in Calibre:
 
 
 
 
 

Gold sold (ounces)
274,980
354,496
1,062,785
1,024,272
1,041,381

Gold produced (ounces)
288,665
367,870
1,061,060
1,027,874
1,047,414

Production costs ($ in thousands)
181,801
176,195
683,963
684,894
549,610

Cash operating costs(2)($/gold ounce sold)
661
497
644
669
528

Cash operating costs(2)($/gold ounce produced)
633
468
654
660
535

Total cash costs(2)($/gold ounce sold)
786
618
776
788
648

All-in sustaining costs(2)($/ounce gold sold)
1,257
892
1,201
1,033
888

(1) Attributable to the shareholders of the Company.
(2) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company’s financial statements, refer to “Non-IFRS Measures”.

Liquidity and Capital Resources

B2Gold continues to maintain a strong financial position and liquidity. At December 31, 2023, the Company had cash and cash equivalents of $307 million (December 31, 2022 – $652 million). Working capital at December 31, 2023 was $397 million (December 31, 2022 – $802 million). During the year ended December 31, 2023, the Company drew down $150 million on the Company’s $700 million revolving credit facility (“RCF”) with $550 remaining available for future draw downs. Subsequent to December 31, 2023, the Company utilized a portion of the proceeds from the $500 million Gold Prepay completed in January 2024 to repay the $150 million balance drawn on the RCF, leaving the full amount of $700 million available for future draw downs.

First Quarter 2024 Dividend

On February 21, 2024, B2Gold’s Board of Directors declared a cash dividend for the first quarter of 2024 (the “Q1 2024 Dividend”) of $0.04 per common share (or an expected $0.16 per share on an annualized basis), payable on March 20, 2024, to shareholders of record as of March 7, 2024.

In 2023, the Company implemented a Dividend Reinvestment Plan (“DRIP”). For the purposes of the Q1 2024 Dividend, the Company is pleased to announce that a discount of 3% will be applied to calculate the Average Market Price (as defined in the DRIP) of its common shares issued from treasury. However, the Company may, from time to time, in its discretion, change or eliminate any applicable discount, which would be publicly announced, all in accordance with the terms and conditions of the DRIP. Participation in the DRIP is optional. In order to participate in the DRIP in time for the Q1 2024 Dividend, registered shareholders must deliver a properly completed enrollment form to Computershare Trust Company of Canada by no later than 4:00 p.m. (Toronto time) on February 29, 2024. Beneficial shareholders who wish to participate in the DRIP should contact their financial advisor, broker, investment dealer, bank, financial institution, or other intermediary through which they hold common shares well in advance of the above date for instructions on how to enroll in the DRIP.

As part of the long-term strategy to maximize shareholder value, B2Gold expects to declare future quarterly dividends at the same level. This dividend is designated as an “eligible dividend” for the purposes of the Income Tax Act (Canada). Dividends paid by B2Gold to shareholders outside Canada (non-resident investors) will be subject to Canadian non-resident withholding taxes.

The declaration and payment of future dividends and the amount of any such dividends will be subject to the determination of the Board, in its sole and absolute discretion, taking into account, among other things, economic conditions, business performance, financial condition, growth plans, expected capital requirements, compliance with B2Gold’s constating documents, all applicable laws, including the rules and policies of any applicable stock exchange, as well as any contractual restrictions on such dividends, including any agreements entered into with lenders to the Company, and any other factors that the Board deems appropriate at the relevant time. There can be no assurance that any dividends will be paid at the intended rate or at all in the future.

For more information regarding the DRIP and enrollment in the DRIP, please refer to the Company’s website at https://www.b2gold.com/investors/stock_info/.

This news release does not constitute an offer to sell or the solicitation of an offer to buy securities in any jurisdiction nor will there be any sale of these securities in any province, state or jurisdiction in which such offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of any such province, state or jurisdiction.

The Company has filed a registration statement relating to the DRIP with the U.S. Securities and Exchange Commission that may be obtained under the Company’s profile on the U.S. Securities and Exchange Commission’s website at http://www.sec.gov/EDGAR or by contacting the Company using the contact information at the end of this news release.

Operations

Fekola Mine – Mali

 
Three months ended
Year ended

 
December 31
December 31

 
2023
2022
2023
2022

 
 
 
 
 

Gold revenue ($ in thousands)
255,509
415,121
1,143,781
1,067,482

Gold sold (ounces)
128,321
237,800
588,460
599,600

Average realized gold price ($/ounce)
1,991
1,746
1,944
1,780

Tonnes of ore milled
2,419,637
2,469,924
9,408,400
9,376,096

Grade (grams/tonne)
1.99
3.31
2.13
2.14

Recovery (%)
93.4
92.8
92.3
92.9

Gold production (ounces)
143,010
244,014
590,243
598,661

Production costs ($ in thousands)
82,921
85,053
333,215
326,529

Cash operating costs(1)($/gold ounce sold)
646
358
566
545

Cash operating costs(1)($/gold ounce produced)
605
348
572
537

Total cash costs(1)($/gold ounce sold)
809
495
729
684

All-in sustaining costs(1)($/gold ounce sold)
1,444
708
1,194
867

Capital expenditures ($ in thousands)
87,830
48,843
298,942
117,622

Exploration ($ in thousands)
2,022
1,366
3,728
15,214

(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company’s financial statements, refer to “Non-IFRS Measures”.

The Fekola Mine in Mali (owned 80% by the Company and 20% by the State of Mali) was a strong performer in 2023, producing 590,243 ounces of gold, near the mid-point of the annual guidance range of 580,000 to 610,000 ounces. For the year ended December 31, 2023, mill feed grade was 2.13 grams per tonne (“g/t”), mill throughput was a record 9.41 million tonnes, and gold recovery averaged 92.3%. In the fourth quarter of 2023, the Fekola Mine produced 143,010 ounces of gold. During the fourth quarter of 2023, the Fekola processing facilities continued to outperform expectations as a result of continued favourable ore fragmentation and continued optimization of the grinding circuit. For the fourth quarter of 2023, mill feed grade was 1.99 g/t, mill throughput was 2.42 million tonnes, and gold recovery averaged 93.4%. Mined ore tonnage and grade continue to reconcile well with the Fekola resource model.

For the year ended December 31, 2023, the Fekola Mine’s cash operating costs (see “Non-IFRS Measures“) of $572 per gold ounce produced ($566 per gold ounce sold) were at the lower end of Fekola’s guidance range of between $565 and $625 per gold ounce produced. Fekola’s cash operating costs for the fourth quarter of 2023 were $605 per gold ounce produced ($646 per gold ounce sold), slightly lower than expected due to higher than anticipated production in the fourth quarter.

All-in sustaining costs (see “Non-IFRS Measures“) for the Fekola Mine for the year ended December 31, 2023 were $1,194 per gold ounce sold, near the low end of the revised guidance range of between $1,175 and $1,235 per gold ounce sold, but higher than the original guidance range of between $1,085 and $1,145 per gold ounce sold. All-in sustaining costs for the Fekola Mine for the fourth quarter of 2023 were $1,444 per gold ounce sold.

Capital expenditures for the year ended December 31, 2023, totalled $299 million, primarily consisting of $80 million for deferred stripping, $84 million for mobile equipment purchases and rebuilds, $39 million for tailings storage facility expansion and equipment, $39 million for the development of the Fekola underground mine, $18 million for the expansion of the solar plant, $12 million for site general capital, $12 million for other mining sustaining capital, $10 million for process and power plant, and $5 million for Bantako road construction. Capital expenditures in the fourth quarter of 2023 totalled $88 million, primarily consisting of $24 million for deferred stripping, $18 million for mobile equipment purchases and rebuilds, $16 million for tailings storage facility expansion and equipment, $14 million for the development of the Fekola underground mine, $7 million for the expansion of the solar plant, $5 million site general capital, and $3 million for other mining sustaining capital.

The Fekola Complex is comprised of the Fekola Mine (Medinandi permit hosting the Fekola and Cardinal pits and Fekola underground) and Fekola Regional (Anaconda Area (Bantako, Menankoto, and Bakolobi permits) and the Dandoko permit). The Fekola Complex is expected to produce between 470,000 and 500,000 ounces of gold in 2024 at cash operating costs of between $835 and $895 per ounce and all-in sustaining costs of between $1,420 and $1,480 per ounce. The Fekola Complex’s total 2024 gold production is anticipated to decrease relative to 2023, predominantly as a result of the delay in receiving an exploitation license for Fekola Regional from the Government of Mali, delaying the 80,000 to 100,000 ounces that were scheduled in the life of mine plan to be trucked to the Fekola mill and processed in 2024. The contribution of this gold production from Fekola Regional is now assumed to commence at the beginning of 2025. If an exploitation license is received in the first half of 2024, there is potential for 2024 Fekola Complex production to be supplemented with up to 18,000 ounces of higher-grade ore from Fekola Regional.

During the year ended December 31, 2023, the State of Mali introduced a new mining code (the “2023 Mining Code”). Receipt of an exploitation license for Fekola Regional remains outstanding pending finalization of an implementation decree for the new 2023 Mining Code by the State of Mali. B2Gold recently held meetings with representatives of the Government of Mali regarding the 2023 Mining Code. The Government of Mali assisted the Company in clarifying the application of the 2023 Mining Code to existing and future projects in Mali, and also expressed their desire for B2Gold to rapidly progress the development of Fekola Regional and committed to assisting the Company in such development.

The haul road from Bantako North to Fekola is complete and construction of the mining infrastructure (warehouse, workshop, fuel depot, and offices) will be completed in the first quarter of 2024. Mining operations will commence upon receipt of an exploitation license, with initial gold production approximately three months after commencement.

Fekola is expected to process 9.4 million tonnes of ore during 2024 at an average grade of 1.77 g/t gold with a process gold recovery of 90.9%. Gold production is expected to be evenly weighted between the first half of 2024 and the second half of 2024. In the second half of 2024, gold production is expected to be weighted approximately 40% to the third quarter and approximately 60% to the fourth quarter.

The expected increase in Fekola’s all-in sustaining costs for 2024 relative to 2023 reflects the expected decrease in production at Fekola in 2024 due to the delay in receiving an exploitation license for Fekola Regional and higher sustaining capital expenditures. Capital expenditures in 2024 at Fekola are expected to total approximately $309 million, of which approximately $202 million is classified as sustaining capital expenditures and $107 million is classified as non-sustaining expenditures. Sustaining capital expenditures are anticipated to include $80 million for deferred stripping, $45 million for ongoing construction of the new tailings storage facility (expected to be completed in the second quarter of 2025), $39 million for new and replacement Fekola mining equipment, including capitalized rebuilds, and $19 million for the expansion of the Fekola solar plant (expected to be completed in the third quarter of 2024). Non-sustaining capital expenditures are anticipated to include $64 million for underground mine development and $43 million for mine development and infrastructure at Fekola Regional.

Masbate Mine – The Philippines

 
Three months ended
Year ended

 
December 31
December 31

 
2023
2022
2023
2022

 
 
 
 
 

Gold revenue ($ in thousands)
107,063
94,010
372,902
384,714

Gold sold (ounces)
53,500
53,865
190,800
214,015

Average realized gold price ($/ounce)
2,001
1,745
1,954
1,798

Tonnes of ore milled
2,077,503
2,043,931
8,302,075
7,929,094

Grade (grams/tonne)
0.90
1.08
0.97
1.11

Recovery (%)
77.0
68.3
74.5
74.9

Gold production (ounces)
46,490
48,687
193,502
212,728

Production costs ($ in thousands)
43,733
47,228
160,952
177,705

Cash operating costs(1) ($/gold ounce sold)
817
877
844
830

Cash operating costs(1) ($/gold ounce produced)
910
872
859
817

Total cash costs(1) ($/gold ounce sold)
933
984
966
937

All-in sustaining costs(1) ($/gold ounce sold)
1,118
1,187
1,143
1,104

Capital expenditures ($ in thousands)
9,195
9,620
30,142
39,528

Exploration ($ in thousands)
1,067
1,648
3,808
4,759

(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company’s financial statements, refer to “Non-IFRS Measures”.

The Masbate Mine in the Philippines continued its strong operational performance in 2023, producing 193,502 ounces of gold, exceeding the upper end of its guidance range of 170,000 to 190,000 ounces. For the year ended December 31, 2023, mill feed grade was 0.97 g/t, mill throughput was a record 8.30 million tonnes, and gold recovery averaged 74.5%. Gold recoveries for 2023 of 74.5% were in-line with those of 2022. Average 2023 gold recoveries were as expected despite processing a higher percentage of sulphide and transitional ore than planned. Masbate’s mill throughput was higher than anticipated in 2023 as a result of continued improvements to optimization of mill operations and blending of mill feed. Mined ore tonnage and grade continue to reconcile well with the Masbate resource model. In the fourth quarter of 2023, Masbate produced 46,490 ounces of gold. Lower ore gold grade during the quarter was offset by higher than expected mill throughput. Fourth quarter 2023 mill feed grade was 0.90 g/t, mill throughput was 2.08 million tonnes, and gold recovery averaged 77.0%.

The Masbate Mine’s cash operating costs (see “Non-IFRS Measures”) of $859 per gold ounce produced ($844 per gold ounce sold) for the year ended December 31, 2023 were at the low end of the revised guidance range of between $855 and $915 per gold ounce produced and significantly below the original guidance range of between $985 and $1,045 per gold ounce produced. As a result of lower than anticipated diesel and heavy fuel oil costs, Masbate experienced lower than expected mining and processing costs throughout 2023, which with the higher than anticipated gold production, contributed significantly to the lower than expected cash operating costs per gold ounce produced for Masbate for the year ended December 31, 2023. The Masbate Mine’s cash operating costs for the fourth quarter of 2023 were $910 per gold ounce produced ($817 per gold ounce sold).

All-in sustaining costs (see “Non-IFRS Measures”) for the Masbate Mine were $1,143 per gold ounce sold for the year ended December 31, 2023, below the lower end of the revised guidance range of between $1,155 and $1,215 per gold ounce sold and well below the original guidance range of between $1,370 and $1,430 per gold ounce sold. All-in sustaining costs for the year ended December 31, 2023 were lower than anticipated as a result of higher than expected gold ounces sold, lower than expected cash operating costs as described above, and lower than anticipated sustaining capital expenditures. All-in sustaining costs for the Masbate Mine for the fourth quarter of 2023 were $1,118 per gold ounce sold.

Capital expenditures totalled $30 million in 2023, primarily consisting of mobile equipment rebuilds and purchases of $17 million, $3 million for the completion of a new powerhouse generator and other powerhouse engine rebuilds, $2 million in deferred stripping, $2 million for tailings storage facility projects, and $2 million for capitalized mill maintenance. Capital expenditures for the fourth quarter of 2023 totalled $9 million, primarily consisting of $5 million for mobile equipment rebuilds and purchases, $1 million for capitalized mill maintenance, $1 million for powerhouse rebuilds, and $1 million for the tailings storage facility.

The Masbate Mine is expected to produce between 170,000 and 190,000 ounces of gold in 2024 at cash operating costs of between $945 and $1,005 per ounce and all-in sustaining costs of between $1,300 and $1,360 per ounce. Gold production is scheduled to be relatively consistent throughout 2024. For 2024, Masbate is expected to process 7.9 million tonnes of ore at an average grade of 0.93 g/t with a process gold recovery of 76.0%. Mill feed will be a blend of mined fresh ore and low-grade ore stockpiles.

Capital expenditures for 2024 at Masbate are expected to total $49 million, of which approximately $33 million is classified as sustaining capital expenditures and $16 million is classified as non-sustaining capital expenditures. Sustaining capital expenditures are anticipated to include $16 million for mining and mobile equipment replacement and rebuilds, $6 million for deferred stripping, $6 million for process plant, and $3 million for tailings storage facility expansion. Non-sustaining capital expenditures are anticipated to include $16 million for land acquisition and mine development.

Otjikoto Mine – Namibia

 
Three months ended
Year ended

 
December 31
December 31

 
2023
2022
2023
2022

 
 
 
 
 

Gold revenue ($ in thousands)
149,402
83,337
417,589
280,394

Gold sold (ounces)
75,100
47,690
214,800
155,540

Average realized gold price ($/ounce)
1,989
1,747
1,944
1,803

Tonnes of ore milled
888,561
839,599
3,443,308
3,412,960

Grade (grams/tonne)
2.88
2.25
1.91
1.50

Recovery (%)
98.5
98.8
98.6
98.5

Gold production (ounces)
81,111
60,068
208,598
161,614

Production costs ($ in thousands)
37,752
27,278
122,030
122,292

Cash operating costs(1) ($/gold ounce sold)
503
572
568
786

Cash operating costs(1) ($/gold ounce produced)
451
465
585
769

Total cash costs(1) ($/gold ounce sold)
582
642
646
858

All-in sustaining costs(1) ($/gold ounce sold)
816
965
984
1,161

Capital expenditures ($ in thousands)
14,797
19,521
61,063
79,096

Exploration ($ in thousands)
1,410
1,201
3,863
3,476

(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company’s financial statements, refer to “Non-IFRS Measures”.

The Otjikoto Mine in Namibia, in which the Company holds a 90% interest, had a strong finish to 2023 and produced an annual record of 208,598 ounces of gold, at the upper end of the guidance range of 190,000 to 210,000 ounces, mainly due to improved processed grade as a result of higher-grade ore mined from the Wolfshag underground mine. For the year ended December 31, 2023, mill feed grade was 1.91 g/t, mill throughput was 3.44 million tonnes, and gold recovery averaged 98.6%. In the fourth quarter of 2023, the Otjikoto Mine produced a quarterly record of 81,111 ounces of gold. For the fourth quarter of 2023, mill feed grade was 2.88 g/t, mill throughput was 0.89 million tonnes, and gold recovery averaged 98.5%.

As of the beginning of 2023, the Probable Mineral Reserve estimate for the Wolfshag deposit included 203,000 ounces of gold in 1.1 million tonnes of ore at an average grade of 5.55 g/t gold. Open pit mining operations at the Otjikoto Mine are scheduled to ramp down throughout 2024 and conclude in 2025, while underground mining operations at Wolfshag are expected to continue through 2026. Processing operations will continue through 2031, when economically viable stockpiles are forecast to be exhausted.

On January 31, 2024, the Company announced positive exploration drilling results from the Antelope deposit at the Otjikoto Mine. The Antelope deposit, comprised of the Springbok Zone, the Oryx Zone, and a possible third structure, Impala, subject to further confirmatory drilling, is located approximately 3 km south of the Otjikoto Phase 5 open pit. The Antelope deposit has the potential to be developed as an underground mining operation, which could complement the expected processing of low-grade stockpiles at the Otjikoto mill from 2026 through 2031.

The Otjikoto Mine’s cash operating costs (see “Non-IFRS Measures“) for the year ended December 31, 2023 were $585 per gold ounce produced ($568 per gold ounce sold), within its revised guidance range of between $545 and $605 per gold ounce produced and below its original guidance range between $590 and $650 per gold ounce produced. Cash operating costs per gold ounce produced for the year ended December 31, 2023 were lower than expectations as a result of higher than expected gold ounces produced and lower operating costs due to a weaker than anticipated Namibian dollar. For the fourth quarter of 2023, the Otjikoto Mine’s cash operating costs were $451 per gold ounce produced ($503 per ounce gold sold).

All-in sustaining costs (see “Non-IFRS Measures“) for the Otjikoto Mine for the year ended December 31, 2023 were $984 per gold ounce sold, within its revised guidance range of between $950 and $1,010 per ounce sold and well below its original guidance range of between $1,080 and $1,140 per ounce sold. All-in sustaining costs for the year ended December 31, 2023 were below the low end of its original guidance range as a result of higher than anticipated gold ounces sold, lower than expected cash operating costs and lower than anticipated sustaining capital expenditures primarily related to deferred stripping and underground development. All-in sustaining costs for the Otjikoto Mine for the fourth quarter of 2023 were $816 per gold ounce sold.

Capital expenditures totalled $61 million in 2023, primarily consisting of $47 million for deferred stripping for the Otjikoto pit, $10 million for Wolfshag underground development, and $2 million in mobile equipment rebuilds. Capital expenditures for the fourth quarter of 2023 totalled $15 million, primarily consisting of $10 million for deferred stripping for the Otjikoto pit and $3 million for Wolfshag underground development.

The Otjikoto Mine is expected to produce between 180,000 and 200,000 ounces of gold in 2024 at cash operating costs of between $685 and $745 per ounce and all-in sustaining costs of between $960 and $1,020 per ounce. Gold production at Otjikoto is expected to be relatively consistent throughout 2024. For 2024, Otjikoto is expected to process a total of 3.4 million tonnes of ore at an average grade of 1.77 g/t with a process gold recovery of 98.0%. Processed ore will be sourced from the Otjikoto pit and the Wolfshag underground mine, supplemented by existing medium and high-grade ore stockpiles.

Capital expenditures in 2024 at Otjikoto are expected to total $33 million, of which approximately $32 million is classified as sustaining capital expenditures and $1 million is classified as non-sustaining capital expenditures. Sustaining capital expenditures are anticipated to include $32 million for deferred stripping and deferred underground development.

Goose Project Development

On April 19, 2023, the Company completed the acquisition of Sabina Gold & Silver Corp. (“Sabina”), resulting in the Company acquiring Sabina’s 100% owned Back River Gold District located in Nunavut, Canada by issuing approximately 216 million common shares of B2Gold as consideration. The Back River Gold District consists of five mineral claims blocks along an 80 km belt.

B2Gold recognizes that respect and collaboration with the Kitikmeot Inuit Association (“KIA”) is central to the license to operate in the Back River Gold District and will continue to prioritize developing the project in a manner that recognizes Inuit priorities, addresses concerns, and brings long-term socio-economic benefits to the Kitikmeot Region. B2Gold looks forward to continuing to build on its strong collaboration with the KIA and Kitikmeot Communities.

Construction at the Goose Project continues to progress on track, with the project remaining on schedule to pour first gold in the first quarter of 2025. Concrete and steel works in the mill area to date are progressing ahead of schedule. Exterior cladding of the mill building and truck shop is complete and cladding of the power house will commence in the first quarter of 2024. Enclosure of these buildings has allowed for work to continue through the colder months and remain on schedule. Additionally, the ball mill will be set in place in the first quarter of 2024, approximately four months ahead of schedule, and the focus will switch to piping, electrical, and mechanical systems as materials begin to arrive via the WIR from the MLA. Crews for installation of piping, electrical, and mechanical systems have been mobilized and will work within the enclosed workshops and buildings as the site ramps up to peak 2024 construction season. Progress to date has considerably de-risked the Goose Project as the site ramps up to the peak 2024 construction season.

Following the successful completion of the 2023 sealift, construction of the 163 km WIR between the MLA and the Goose Project is being finalized. The WIR is scheduled to be fully operational by February 23, 2024, transporting all required materials from the MLA to the Goose Project site by the end of April 2024, keeping the Goose Project on schedule to pour first gold in the first quarter of 2025.

After completing a detailed review of the Goose Project design, materials, and construction schedule as part of the 2024 budgeting process, the Company has revised the total construction capital estimate from C$800 million to C$1,050 million. Most of the increase in the construction capital estimate relates to underestimated labour and site operating costs in the feasibility study, along with additional general inflationary impacts on construction materials, consumables, and transportation costs. In addition, a detailed review of the project design has identified deficiencies in project components including power generation and distribution, laboratory, piping, and controls and instrumentation, which are being corrected to deliver a reliable operation. In 2024, B2Gold expects to incur approximately C$280 million in construction capital costs. Future construction cost variance is expected to be minimal as over half of the construction capital costs to be incurred in 2024 are related to labour in order to bring the project close to commissioning by the end of the year, and all major components have been purchased or are under contract. In the fourth quarter of 2023 and post-acquisition to December 31, 2023, the Company incurred $126 million (C$171 million) and $282 million (C$381 million), respectively for construction activities at the Goose Project.

In addition, the net cost of open pit and underground development, deferred stripping, and sustaining capital expenditures to be incurred prior to first gold production is estimated at approximately C$200 million (including approximately C$125 million of direct mining costs related to open pit and underground development). The cost of these initiatives is primarily related to optimization changes in the underground mine plan as a result of switching the underground mining method to long-hole stoping and prioritizing ore from the Umwelt crown pillar area ahead of the zones below. It is anticipated that the increase in underground development costs will be offset during operations through lower sustainable operating costs than could be achieved with the cut-and-fill underground mining method. Additionally, B2Gold has elected to advance open pit mining of the Echo Pit, which is underway and will produce construction fill, stockpile ore, and provide tailings storage capacity. Open pit mining of the Umwelt Pit is expected to commence later in the first quarter of 2024 and will produce much of the commissioning ore as well as future tailings storage. In 2024, B2Gold expects to incur approximately C$170 million in open pit and underground development, deferred stripping, and sustaining capital expenditures.

In 2024, the Company will undertake a buildup of working capital over the Goose Project construction period up to the first quarter of 2025 in order to materially de-risk the execution of the production ramp-up phase and initial years of operation by including 2025 and certain 2026 consumables and sustaining capital equipment on the 2024 sealift. Areas of focus for working capital include: accelerated purchase and additional storage of diesel fuel to manage the requirements for operations in 2025 and part of 2026; critical inventory of consumables and spares for mining and processing to avoid the requirement for air transport; and development of open pit and underground ore stockpiles to provide a consistent and uninterrupted feed to the process plant. The Company estimates that approximately C$205 million of fuel, reagents, and other working capital items will be purchased in 2024 to build up site inventory levels, which will substantially de-risk the project from operational and supply chain disruptions. Post-acquisition to December 31, 2023, $57 million of consumables inventory costs were incurred, including long-term consumables of $44 million.

Fekola Complex Development

Based on B2Gold’s preliminary planning, the Anaconda Area could provide selective higher-grade saprolite material (average annual grade of up to 2.2 g/t gold) to be trucked approximately 20 km and fed into the Fekola mill at a rate of up to 1.5 million tonnes per annum. Trucking of selective higher-grade saprolite material from the Anaconda Area to the Fekola mill will increase the ore processed and has the potential to generate approximately 80,000 to 100,000 ounces of gold production per year from Fekola Regional sources. Receipt of a mining permit for the Fekola Regional licenses remains outstanding pending finalization of an implementation decree for the new 2023 Mining Code by the State of Mali. The Company does not currently forecast any production from Fekola Regional in the Company’s 2024 guidance, with production now expected to commence at the beginning of 2025. If an exploitation license for Fekola Regional is received in the first half of 2024, there is potential for 2024 Fekola Complex production to be supplemented with up to 18,000 ounces of higher-grade ore from Fekola Regional. In addition, if the Company is successful in discovering additional sulphide ore across the Fekola Complex, the trucking of oxide ore from Fekola Regional to the Fekola mill may potentially be extended. B2Gold recently held meetings with the representatives of the Government of Mali regarding the 2023 Mining Code. The Government of Mali assisted the Company in clarifying the application of the 2023 Mining Code to existing and future projects in Mali, and also expressed their desire for B2Gold to rapidly progress the development of Fekola Regional and committed to assisting the Company in such development.

For the fourth quarter of 2023 and the year ended December 31, 2023, the Company invested $10 million and $56 million respectively, in the development of Fekola Regional (Anaconda Area) saprolite mining including road construction, mine infrastructure, and mining equipment. For 2023, the Company had budgeted a total of $63 million for Fekola Regional development.

Gramalote Project Development

B2Gold’s in-house projects team has commenced work on various smaller scale project development plans for the Gramalote Project, with the goal of identifying a higher-return project than the previously contemplated joint venture development plan. Based on the results of the 2022 Gramalote feasibility study, the contemplated larger scale project did not meet the combined investment return thresholds for development by both B2Gold and AngloGold. In 2023, B2Gold completed a detailed review of the Gramalote Project, including the facility size and location, power supply, mining and processing options, tailings design, resettlement, potential construction sequencing, and camp design to identify potential cost savings to develop a smaller scale project. The results of the review allowed the Company to determine the optimal parameters and assumptions for a formal study, which commenced in the fourth quarter of 2023, with the goal of completing a PEA by the end of the second quarter of 2024.

Exploration

B2Gold executed another year of aggressive exploration in 2023 incurring $78 million (including $2 million of target generation costs included in other operating expenses in the Consolidated Statement of Operations) compared to a revised budget of approximately $84 million (original budget of $64 million). Exploration in 2023 was focused predominantly in Mali, other operating mine sites in Namibia and the Philippines, both infill and generative exploration at the Back River Gold District, as well as a continued focus on grassroots targets around the world.

B2Gold is planning another year of extensive exploration in 2024 with a budget of approximately $63 million. A significant focus will be exploration at the Back River Gold District, with the goal of enhancing and growing the significant resource base at the Goose Project and surrounding regional targets. In Namibia, the exploration program at the Otjikoto Mine will be the largest program since 2012, with 39,000 meters of drilling planned to define and expand the recently discovered Antelope deposit. In Mali, the exploration program will be a more strategic search for near-mine, near-surface sources of additional sulphide-related gold mineralization. In the Philippines, the exploration program at Masbate will focus on converting inferred mineral resource areas and expanding the existing open pits. Early stage exploration programs will continue in Finland, the Philippines, and Cote d’Ivoire in 2024. Finally, the search for new joint ventures and strategic investment opportunities will continue, building on existing equity investments in Snowline Gold Corp. and Matador Mining Ltd.

Outlook

Total gold production in 2024 is anticipated to be between 860,000 and 940,000 ounces, including 40,000 to 50,000 ounces of attributable production from Calibre. Production is expected to be relatively consistent throughout 2024, with third quarter production expected to be slightly lower and fourth quarter production expected to be slightly higher. The expected decrease in gold production relative to 2023 is predominantly due to lower production at the Fekola Complex as a result of the delay in receiving an exploitation license for Fekola Regional from the Government of Mali, delaying the 80,000 to 100,000 ounces that were scheduled in the life of mine plan to be trucked to the Fekola mill and processed in 2024. The contribution of this gold production from Fekola Regional is now assumed to commence at the beginning of 2025. The Company’s total consolidated cash operating costs for the year (including estimated attributable results for Calibre) are forecast to be between $835 and $895 per gold ounce produced and total consolidated all-in sustaining costs (including estimate attributable results for Calibre) are forecast to be between $1,360 and $1,420 per gold ounce sold. The anticipated increase in the Company’s consolidated cash operating costs per ounce for 2024 reflects the processing of lower-grade ore at Fekola in 2024. The total consolidated all-in sustaining costs per ounce for 2024 reflect the final full year of spending on both the new Fekola tailings storage facility and the Fekola solar plant expansion, in addition to the ongoing substantial capitalized stripping campaign planned at Fekola for 2024.

B2Gold consolidated gold production is expected to increase to record levels in 2025. Based on current estimates, consolidated gold production in 2025 is expected to be between 1,130,000 and 1,260,000 ounces, driven by a significant increase in gold production from the Fekola Complex, relative to 2024, as a result of the scheduled mining and processing of higher-grade ore from the Fekola and Cardinal pits made accessible by the meaningful stripping campaign that will be undertaken throughout 2024, a full year contribution of higher-grade ore from Fekola Regional, and commencement of mining from the higher-grade Fekola underground (subject to receipt of necessary permits for Fekola Regional and Fekola underground). In addition, the Goose Project is expected to commence gold production in the first quarter of 2025 and contribute between 220,000 and 260,000 ounces of gold production in calendar year 2025. The Company still expects gold production from the Goose Project to be approximately 300,000 ounces per year over the first five years of operation. As a result of the expected completion of several capital projects in 2024 and early 2025, the Company also expects that there will be a significant decrease in both sustaining and growth capital expenditures in 2025.

Construction of the Goose Project is progressing on track, with the project remaining on schedule for first gold pour in the first quarter of 2025. Construction continues ahead of schedule within the mill and processing buildings, along with preparatory work for peak construction activities in the second and third quarters of 2024. Mine development is well underway at the Echo Pit and Umwelt Underground mine to generate high-grade stockpiles prior to mill commissioning. Following the successful completion of the 2023 sealift, construction of the WIR is being finalized and scheduled to be fully operational by February 23, 2024, transporting all required materials from the MLA to the Goose Project site by the end of April 2024.

Results of the Fekola Complex technical report outlining the trucking of ore from the Anaconda Area will be released in the first quarter of 2024. Results indicate that the trucking of both oxide and sulphide ore from Fekola Regional to be toll milled by the Fekola mill is the optimal option to maximize the value of Fekola Regional, and to extend the processing life of the Fekola mill.

The Company has completed a detailed review of the Gramalote Project, including the facility size and location, power supply, mining and processing options, tailings design, resettlement, potential construction sequencing, and camp design to identify potential cost savings to develop a smaller scale project. A formal study commenced in the fourth quarter of 2023, with the goal of completing a PEA by the end of the second quarter of 2024.

The Company’s ongoing strategy is to continue to maximize profitable production from its mines, further advance its pipeline of remaining development and exploration projects, evaluate new exploration, development and production opportunities and continue to pay an industry leading dividend yield.

Fourth Quarter and Full Year 2023 Financial Results – Conference Call Details

B2Gold executives will host a conference call to discuss the results on Thursday, February 22, 2024, at 8:00 am PT / 11:00 am ET.

Participants may register for the conference call here: registration link. Upon registering, participants will receive a calendar invitation by email with dial in details and a unique PIN. This will allow participants to bypass the operator queue and connect directly to the conference. Registration will remain open until the end of the conference call. Registration will remain open until the end of the conference call. Participants may also dial in using the numbers below:

Toll-free in U.S. and Canada: +1 (800) 319-4610
All other callers: +1 (604) 638-5340

The conference call will be available to playback for two weeks by dialing toll-free in the U.S. and Canada: +1 (800) 319-6413, replay access code 0672. All other callers: +1 (604) 638-9010, replay access code 0672.

About B2Gold

B2Gold is a low-cost international senior gold producer headquartered in Vancouver, Canada. Founded in 2007, today, B2Gold has operating gold mines in Mali, Namibia and the Philippines, a mine under construction in northern Canada and numerous development and exploration projects in various countries including Mali, Colombia and Finland. B2Gold forecasts total consolidated gold production of between 860,000 and 940,000 ounces in 2024.

Qualified Persons

Bill Lytle, Senior Vice President and Chief Operating Officer, a qualified person under NI 43-101, has approved the scientific and technical information related to operations matters contained in this news release.

Andrew Brown, P. Geo., Vice President, Geology & Technical Services, a qualified person under NI 43-101, has approved the scientific and technical information related to exploration and mineral resource matters contained in this news release.

ON BEHALF OF B2GOLD CORP.

“Clive T. Johnson” 
President and Chief Executive Officer

The Toronto Stock Exchange and NYSE American LLC neither approve nor disapprove the information contained in this news release.  

Production results and production guidance presented in this news release reflect total production at the mines B2Gold operates on a 100% project basis. Please see our Annual Information Form dated March 16, 2023 for a discussion of our ownership interest in the mines B2Gold operates.

This news release includes certain “forward-looking information” and “forward-looking statements” (collectively “forward-looking statements”) within the meaning of applicable Canadian and United States securities legislation, including: projections; outlook; guidance; forecasts; estimates; and other statements regarding future or estimated financial and operational performance, gold production and sales, revenues and cash flows, and capital costs (sustaining and non-sustaining) and operating costs, including projected cash operating costs and AISC, and budgets on a consolidated and mine by mine basis, which if they occur, would have on our business, our planned capital and exploration expenditures; future or estimated mine life, metal price assumptions, ore grades or sources, gold recovery rates, stripping ratios, throughput, ore processing; statements regarding anticipated exploration, drilling, development, construction, permitting and other activities or achievements of B2Gold; and including, without limitation: projected gold production, cash operating costs and AISC on a consolidated and mine by mine basis in 2024; total consolidated gold production of between 860,000 and 940,000 ounces in 2024, with cash operating costs of between $835 and $895 per ounce and AISC of between $1,360 and $1,420 per ounce; the Company’s gold production to be relatively consistent throughout 2024; consolidated gold production of between 1,130,000 and 1,260,000 ounces in 2025, including a significant increase in the gold production at the Fekola Complex, with expected lower consolidated AISC; B2Gold’s continued prioritization of developing the Goose Project in a manner that recognizes Indigenous input and concerns and brings long-term socio-economic benefits to the area; the Goose Project capital cost being approximately C$1,050 million, and the net cost of open pit and underground development, deferred stripping, and sustaining capital expenditures to be incurred prior to first gold production being approximately C$200 million; the construction capital cost to complete the Goose Project being approximately C$335 million; the WIR at the Goose Project being operational by February 23, 2024; the potential for first gold production in the first quarter of 2025 from the Goose Project; the Company’s total capitalized stripping expenditures moderating in 2024; the potential for Fekola Regional to provide saprolite material to feed the Fekola mill within three months after receipt of an exploitation license; the timing and results of a study for the Fekola Complex optimization study; the significant increase in gold production in 2025 from the Fekola Complex as a result of the scheduled ore from Fekola Regional and commencement of mining at Fekola underground; the impact of the 2023 Mali Mining Code; the potential to extend Wolfshag underground mine past 2026; the potential for the Antelope deposit to be developed as an underground operation and contribute gold during the low-grade stockpile processing in 2026 through 2031; the timing and results of a PEA for the Gramalote Project; and B2Gold’s attributable share of Calibre’s production. All statements in this news release that address events or developments that we expect to occur in the future are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, although not always, identified by words such as “expect”, “plan”, “anticipate”, “project”, “target”, “potential”, “schedule”, “forecast”, “budget”, “estimate”, “intend” or “believe” and similar expressions or their negative connotations, or that events or conditions “will”, “would”, “may”, “could”, “should” or “might” occur. All such forward-looking statements are based on the opinions and estimates of management as of the date such statements are made.

Forward-looking statements necessarily involve assumptions, risks and uncertainties, certain of which are beyond B2Gold’s control, including risks associated with or related to: the volatility of metal prices and B2Gold’s common shares; changes in tax laws; the dangers inherent in exploration, development and mining activities; the uncertainty of reserve and resource estimates; not achieving production, cost or other estimates; actual production, development plans and costs differing materially from the estimates in B2Gold’s feasibility and other studies; the ability to obtain and maintain any necessary permits, consents or authorizations required for mining activities; environmental regulations or hazards and compliance with complex regulations associated with mining activities; climate change and climate change regulations; the ability to replace mineral reserves and identify acquisition opportunities; the unknown liabilities of companies acquired by B2Gold; the ability to successfully integrate new acquisitions; fluctuations in exchange rates; the availability of financing; financing and debt activities, including potential restrictions imposed on B2Gold’s operations as a result thereof and the ability to generate sufficient cash flows; operations in foreign and developing countries and the compliance with foreign laws, including those associated with operations in Mali, Namibia, the Philippines and Colombia and including risks related to changes in foreign laws and changing policies related to mining and local ownership requirements or resource nationalization generally; remote operations and the availability of adequate infrastructure; fluctuations in price and availability of energy and other inputs necessary for mining operations; shortages or cost increases in necessary equipment, supplies and labour; regulatory, political and country risks, including local instability or acts of terrorism and the effects thereof; the reliance upon contractors, third parties and joint venture partners; the lack of sole decision-making authority related to Filminera Resources Corporation, which owns the Masbate Project; challenges to title or surface rights; the dependence on key personnel and the ability to attract and retain skilled personnel; the risk of an uninsurable or uninsured loss; adverse climate and weather conditions; litigation risk; competition with other mining companies; community support for B2Gold’s operations, including risks related to strikes and the halting of such operations from time to time; conflicts with small scale miners; failures of information systems or information security threats; the ability to maintain adequate internal controls over financial reporting as required by law, including Section 404 of the Sarbanes-Oxley Act; compliance with anti-corruption laws, and sanctions or other similar measures; social media and B2Gold’s reputation; risks affecting Calibre having an impact on the value of the Company’s investment in Calibre, and potential dilution of our equity interest in Calibre; as well as other factors identified and as described in more detail under the heading “Risk Factors” in B2Gold’s most recent Annual Information Form, B2Gold’s current Form 40-F Annual Report and B2Gold’s other filings with Canadian securities regulators and the U.S. Securities and Exchange Commission (the “SEC”), which may be viewed at www.sedar.com and www.sec.gov, respectively (the “Websites”). The list is not exhaustive of the factors that may affect B2Gold’s forward-looking statements.

B2Gold’s forward-looking statements are based on the applicable assumptions and factors management considers reasonable as of the date hereof, based on the information available to management at such time. These assumptions and factors include, but are not limited to, assumptions and factors related to B2Gold’s ability to carry on current and future operations, including: development and exploration activities; the timing, extent, duration and economic viability of such operations, including any mineral resources or reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; B2Gold’s ability to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the price and market for outputs, including gold; foreign exchange rates; taxation levels; the timely receipt of necessary approvals or permits; the ability to meet current and future obligations; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions; and other assumptions and factors generally associated with the mining industry.

B2Gold’s forward-looking statements are based on the opinions and estimates of management and reflect their current expectations regarding future events and operating performance and speak only as of the date hereof. B2Gold does not assume any obligation to update forward-looking statements if circumstances or management’s beliefs, expectations or opinions should change other than as required by applicable law. There can be no assurance that forward-looking statements will prove to be accurate, and actual results, performance or achievements could differ materially from those expressed in, or implied by, these forward-looking statements. Accordingly, no assurance can be given that any events anticipated by the forward-looking statements will transpire or occur, or if any of them do, what benefits or liabilities B2Gold will derive therefrom. For the reasons set forth above, undue reliance should not be placed on forward-looking statements.

Non-IFRS Measures
This news release includes certain terms or performance measures commonly used in the mining industry that are not defined under International Financial Reporting Standards (“IFRS”), including “cash operating costs” and “all-in sustaining costs” (or “AISC”). Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS and should be read in conjunction with B2Gold’s consolidated financial statements. Readers should refer to B2Gold’s Management Discussion and Analysis, available on the Websites, under the heading “Non-IFRS Measures” for a more detailed discussion of how B2Gold calculates certain of such measures and a reconciliation of certain measures to IFRS terms.

Cautionary Statement Regarding Mineral Reserve and Resource Estimates
The disclosure in this news release was prepared in accordance with Canadian National Instrument 43-101, which differs significantly from the requirements of the United States Securities and Exchange Commission (“SEC”), and resource and reserve information contained or referenced in this news release may not be comparable to similar information disclosed by public companies subject to the technical disclosure requirements of the SEC. Historical results or feasibility models presented herein are not guarantees or expectations of future performance.

 

B2GOLD CORP.
CONSOLIDATED STATEMENTS OF OPERATIONS
(Expressed in thousands of United States dollars, except per share amounts)
(Unaudited)

 

 

 
 
For the three
months ended
Dec. 31, 2023

 
 
For the three
months ended
Dec. 31, 2022

 
 
For the twelve
months ended
Dec. 31, 2023

 
 
For the twelve
months ended
Dec. 31, 2022

 

 
 
 
 
 
 
 
 
 

Gold revenue
 
$
511,974
 
 
$
592,468
 
 
$
1,934,272
 
 
$
1,732,590
 

 
 
 
 
 
 
 
 
 

Cost of sales
 
 
 
 
 
 
 
 

Production costs
 
 
(164,406
)
 
 
(159,559
)
 
 
(616,197
)
 
 
(626,526
)

Depreciation and depletion
 
 
(108,983
)
 
 
(130,508
)
 
 
(402,371
)
 
 
(383,852
)

Royalties and production taxes
 
 
(33,042
)
 
 
(41,733
)
 
 
(135,703
)
 
 
(117,968
)

Total cost of sales
 
 
(306,431
)
 
 
(331,800
)
 
 
(1,154,271
)
 
 
(1,128,346
)

 
 
 
 
 
 
 
 
 

Gross profit
 
 
205,543
 
 
 
260,668
 
 
 
780,001
 
 
 
604,244
 

 
 
 
 
 
 
 
 
 

General and administrative
 
 
(21,194
)
 
 
(20,718
)
 
 
(62,364
)
 
 
(54,479
)

Share-based payments
 
 
(5,187
)
 
 
(6,590
)
 
 
(20,921
)
 
 
(24,843
)

(Impairment) reversal of impairment of long-lived assets
 
 
(205,666
)
 
 

 
 
 
(322,148
)
 
 
909
 

Write-down of mining interests
 
 
(2,883
)
 
 
(5,281
)
 
 
(19,905
)
 
 
(12,366
)

Foreign exchange (losses) gains
 
 
(1,432
)
 
 
6,385
 
 
 
(16,020
)
 
 
(10,054
)

Share of net income of associates
 
 
2,322
 
 
 
1,192
 
 
 
19,871
 
 
 
10,183
 

Restructuring charges
 
 

 
 
 

 
 
 
(12,151
)
 
 

 

Community relations
 
 
(1,322
)
 
 
(793
)
 
 
(5,205
)
 
 
(2,738
)

Loss on sale on sale of mining interest
 
 

 
 
 

 
 
 

 
 
 
(2,804
)

Other expense
 
 
(5,365
)
 
 
(2,909
)
 
 
(13,761
)
 
 
(5,655
)

Operating (loss) income
 
 
(35,184
)
 
 
231,954
 
 
 
327,397
 
 
 
502,397
 

 
 
 
 
 
 
 
 
 

Interest and financing expense
 
 
(4,893
)
 
 
(2,859
)
 
 
(13,925
)
 
 
(10,842
)

Interest income
 
 
2,778
 
 
 
4,168
 
 
 
18,519
 
 
 
11,964
 

Change in fair value of gold stream
 
 
(18,800
)
 
 

 
 
 
(12,300
)
 
 

 

(Losses) gains on derivative instruments
 
 
(1,393
)
 
 
672
 
 
 
4,699
 
 
 
18,969
 

Other income (expense)
 
 
1,012
 
 
 
1,616
 
 
 
(4,057
)
 
 
8,129
 

(Loss) income from operations before taxes
 
 
(56,480
)
 
 
235,551
 
 
 
320,333
 
 
 
530,617
 

 
 
 
 
 
 
 
 
 

Current income tax, withholding and other taxes
 
 
(73,926
)
 
 
(107,496
)
 
 
(290,081
)
 
 
(247,811
)

Deferred income tax recovery
 
 
13,010
 
 
 
48,413
 
 
 
11,336
 
 
 
3,917
 

Net (loss) income for the period
 
$
(117,396
)
 
$
176,468
 
 
$
41,588
 
 
$
286,723
 

 
 
 
 
 
 
 
 
 

Attributable to:
 
 
 
 
 
 
 
 

Shareholders of the Company
 
$
(113,224
)
 
$
157,756
 
 
$
10,097
 
 
$
252,873
 

Non-controlling interests
 
 
(4,172
)
 
 
18,712
 
 
 
31,491
 
 
 
33,850
 

Net (loss) income for the period
 
$
(117,396
)
 
$
176,468
 
 
$
41,588
 
 
$
286,723
 

 
 
 
 
 
 
 
 
 

(Loss) earnings per share
(attributable to shareholders of the Company)
 
 
 
 
 
 
 
 

Basic
 
$
(0.09
)
 
$
0.15
 
 
$
0.01
 
 
$
0.24
 

Diluted
 
$
(0.09
)
 
$
0.15
 
 
$
0.01
 
 
$
0.24